An Austrian investor is building a hydropowerplant near Samsun, on the Black Sea coast in Turkey. On behalf of the investor, convex ZT GmbH carried out the basic design. The diversion hydropowerplant has a design flow of 5,9 m3/s and a net head of 399 m. It will equipped with two Pelton turbines with an… Read more »
Arabian Bemco Contracting Co. was awarded a US$ 3 billion contract in June 30, 08 with SEC for turnkey supply and installation of a 3.000 MW built on a 5 million square meter PP-10 plant outside the capital of Saudi Arabia, Riyadh. This is a greenfield project that will initially install 36 GTG simple cycle… Read more »
ANDRITZ Energy & Environment (AE&E) has received an order from Empresa Eléctrica Guacolda to supply three flue gas cleaning plants using the ANDRITZ Turbo-CDS system, four desalination plants and a selective catalytic reduction DeNOx system for Guacolda, a 608 MW coal-fired power station in Huasco, Chile. Start-up is scheduled for late 2015/early 2016. The order… Read more »
Andritz has received an order from the Chilean power generation company AES Gener S.A. for the turnkey supply of a flue gas desulphurisation plant incl. bag filter for the coal fired power plant Tocopilla (2 x 140 MW). On behalf of Andritz, convex ZT GmbH is carrying out the construction permit and civil design works…. Read more »
As part of the noise abatement program on railways, DB Netz AG is building noise protection walls at the section Heidelberg Hbf-Neckarelz. The noise barrier is located on the right side of the track, starts at km 5.6+60 and ends at km 6.4+40. All highly absorbent wall panels are made of aluminum, type “NOISE PHALANX”…. Read more »
Noise protection walls with a total length of 4,000 m and an effective heigth of 2 – 5 m are built along the A2 motorway at the area of the junction Graz-Ost. On behalf of ASFINAG Bau Management GmbH, the overall design, tendering and tender evaluation was performed by convex ZT GmbH. The noise protection… Read more »