Status: completed projects
BUSINESS PARK 8, GLEISDORF

BPGS GmbH is building a new office and commercial building in Gleisdorf with two basements, three upper floors and a penthouse. A total of 100 above-ground and 22 underground parking spaces are foreseen. Completion of the 3.100 m² office space and 1.100 m² cellar and storage space is scheduled for June 2019. The building will… Read more »
WIND POWERPLANT TAFILA II
PAPER MILL SAPPI SAICCOR
NOISE STUDY VEKH VIENNA

The “Vereinigte Eisfabriken und Kühlhallen in Wien (VEKH)” operates facilities for the proper storage of frozen food in Vienna. Due to the operational noise emissions caused mainly by the refrigeration units of the trucks, it came in the past to complaints from the residents of the adjacent residential buildings. convex ZT GmbH was commissioned by… Read more »
PIPELINE MSCP DUNDEE
RENOVATION DEEP-FREEZE STORAGE HALL, VIENNA

The deep-freeze storage hall IV of the Vereinigte Eisfabriken und Kühlhallen in Vienna (VEKH) has to be completely refurbished. The deep-freeze storage hall IV was built in 1974, and since then, it has been in operation at a temperature of -28 °C. It was decided to renewe the entire façade and roof covering. The existing… Read more »
CHP WERNDORF

VERBUND Thermal Power (VTP) is building a gas boiler plant to generate district heating in Mellach / Werndorf. The facility is used to secure the district heating in the southern grid area of the city of Graz. The plant with three boilers will have a fuel heat output of 97.5 MWth at full load. The… Read more »
SCR-PLANT CURRENTA LEVERKUSEN

International technology group ANDRITZ AG has received an order from Currenta GmbH & Co. OHG to deliver a SCR DeNOx plant (SCR: Selective Catalytic Reduction) for the hazardous waste incineration plant in Bürrig at its CHEMPARK site in Leverkusen, Germany. On behalf of ANDRITZ AG, convex ZT GmbH was responsible for the permit, basic and… Read more »
NOISE STUDY, PRODUCTION HALL ANDRITZ AG, GRAZ

Andritz AG carried out the conversion of an existing production hall into the so-called TIAC Hall for the installation of a paper machine and other equipment and machines required for paper production. Due to the noise emissions from the new paper machine, an noise calculation, including noise measurements as well as determination and assessment of… Read more »