DB Netz AG is erecting new noise barriers along the 5200 railway line in the area of Retzbach – Zellingen in Lower Franconia to protect the local population from rail noise emissions. The total length of the walls is approx. 1,200 m with a height of up to 3.0 m above the upper edge of… Read more »
Status: completed projects
SEAWATER-FGD, POWER PLANT VASILIKOS
DRILL SITE, BEGUMGONJ
BUSINESS PARK 8, GLEISDORF
BPGS GmbH is building a new office and commercial building in Gleisdorf with two basements, three upper floors and a penthouse. A total of 100 above-ground and 22 underground parking spaces are foreseen. Completion of the 3.100 m² office space and 1.100 m² cellar and storage space is scheduled for June 2019. The building will… Read more »
OPERATIONS BUILDING, BAUMGARTEN
Gas Connect Austria GmbH (GCA) is erecting a new operations building, a boiler house and a generator house at the Baumgarten compressor station site. On behalf of GCA convex ZT GmbH is responsible as general designer for the design, the tender, the permit and execution design and partly for the construction supervision. The domestic services and small… Read more »
WIND POWERPLANT TAFILA II
PAPER MILL SAPPI SAICCOR
GLYCERINFROMAL PLANT
ENERGY FROM WASTE ISTANBUL
NOISE STUDY VEKH VIENNA
The “Vereinigte Eisfabriken und Kühlhallen in Wien (VEKH)” operates facilities for the proper storage of frozen food in Vienna. Due to the operational noise emissions caused mainly by the refrigeration units of the trucks, it came in the past to complaints from the residents of the adjacent residential buildings. convex ZT GmbH was commissioned by… Read more »