Status: completed projects

FLUE GAS DESULPHURISATION PLANT, VENTANAS

Andritz has received an order from the Chilean power generation company AES Norgener S.A. for the turnkey supply of one flue gas desulphurisation plant incl. bag filter for Unit 1 (120 MW) and one bag filter for Unit 2 (218 MW) of the coal fired power plant Ventanas. On behalf of Andritz, convex ZT GmbH… Read more »

NOISE PROTECTION WALL, SCHLADMING

In course of the World Ski Championships 2013 in Schladming, the local infrastructure was improved with additional approach- and exit roads to the main road B320. On behalf of the Province of Styria, the design of the noise barriers on these roads with a total length of 3.200 meters was carried out by convex ZT… Read more »

CONCERT HALL MUTH, VIENNA

The concert hall of the Vienna Boys Choir in Vienna is an ensemble of baroque buildings (gatehouse and surrounding wall) and modern architecture. The core of the new concert hall is decorated in warm and bright colors, contrasting with the outer appearance of the new building made of glass and metal materials. The brilliant acoustics… Read more »

PHYRN AUTOBAHN A9, BRIDGE REHABILITATION

In the course of the ASFINAG highway construction program, in 2012, on the motorway A9, section Selzthal – Trieben, extensive road and bridge rehabilitation works were conducted. On behalf of ASFINAG, convex ZT GmbH was responsible for the baseline survey and determination of remedial measures, the structural design of these measures, the definition and evaluation… Read more »

CCPP PETROBRAZI

The Petrobrazi Combined Cycle Heat and Power Plant (CCHP) is located in the municipality of Brazi, which is situated about 4 km south east of town of Ploiesti, about 40 km to the north of the city of Bucharest. The site of the powerplant will be within the area of the Petrobrazi Refinery. The power… Read more »

CCPP NUON MAGNUM

Nuon is developing a new power plant that shall start commercial operation in 2011. The multi-fuel power plant will be based on gasification technology, which is one of the cleanest and most flexible ways of generating electricity from solid or liquid fuels. The power plant will be built in phases, starting with the 1200 MW… Read more »

COAL FIRED POWER PLANT GÖLBAŞI

GEP GmbH is erecting a 150 MW coal fired power plant in Gölbaşı, Turkey. The power plant will be situated close to the Gölbaşı coal mine, where lignite coal is extracted in open pit mining. The applied fluidised bed boiler technology shall ensure the compliance with the emission limit values without the erection of a… Read more »

CCPP MELLACH

VERBUND is erecting a 830 MW gas fired combined cycle power plant in Mellach/Austria that shall start commercial operation 2011. SIEMENS AG from Germany was appointed as general contractor. Civil construction works are carried out by the consortium STRABAG-Porr from Austria. The ground conditions on site made soil improvement measures necessary. Stone columns of 0,8… Read more »

WIND POWERPLANT DOROBANTU

SC Wind Power Park s.r.l., a fully owned subsidiary by OMV/PETROM, is realising the first renewable power project of OMV Gas & Power. The wind park project in Dorobantu, Romania is implementing 15 pcs Vestas V90 3 MW turbines and will have a planned capacity of 45 MW. The regions excellent wind conditions enable a… Read more »