Status: current projects

HYDROGEN PRODUCTION PLANT, SALZGITTER

A 100 MW electrolysis plant is being built on the site of Salzgitter Flachstahl GmbH. The EPC-based AEL plant supplied by Andritz AG will operate with alkaline electrolysers from HydrogenPro. From 2026, the plant will produce around 9,000 tonnes of green hydrogen per year, which will be used for the production of green steel. On… Read more »

POWER-TO-GAS, RIGA

In Riga, the capital of Latvia, the carbon dioxide is to be separated from the exhaust air of the biomass cogeneration plant located at the same site, methanised with green hydrogen and stored as synthetic natural gas in the natural underground storage facility currently in operation or fed into the natural gas grid. The power-to-gas… Read more »

VOCATIONAL TRAINING CENTRUM, BANJUWANGI

The Indonesian Ministry of Labour operates 301 vocational training centres nationwide. The tourism and welding training centre in Banyuwangi is being build as turn-key project by eee Austria international projects GmbH. The main objective of the project is to train job-seeking individuals for specific occupations in the tourism and welding industry, making them job-ready for the local… Read more »

BORWIN4 & DOLWIN4, LINGEN

Amprion Offshore GmbH‘s offshore grid connection systems DolWin4 and BorWin4, which run largely in parallel, are among the most important energy transition projects in Germany. Amprion uses high voltage direct current transmission for the lines, which can be used to transport large amounts of electricity with low losses. The DolWin4 and BorWin4 onshore converter stations… Read more »

GETH2 NUKLEUS, LINGEN

The GET H2 initiative aims to establish the core for a nationwide hydrogen infrastructure in Germany and thus make the implementation of the energy transition possible. In the first phase of this initiative, with the GET H2 NUKLEUS project, a 300 MW electrolysis plant will be build at RWE’s Lingen site in three expansion stages,… Read more »

CLONE:IT

The design of buildings takes place in the office, their implementation on the construction site. The task is to communicate the design, which is usually done in 3D, to the construction site: nowadays this is still done with paper drawings, in 2D. This means that there is a loss of information in the transfer of… Read more »

NOISE PROTECTION WALL BERLIN-KÖPENICK

As part of the infrastructure project “Berlin – Frankfurt/Oder – border D/PL”, extensive construction work is being carried out in the Köpenick station area. Both the urban rail line and the parallel urban rail line Berlin Ostbahnhof – Erkner are being renewed. In addition to the traffic facilities, comprehensive noise protection measures in the form… Read more »