HEPP MESTIACHALA 1 & 2

Two diversion hydroelectric powerplants will be built at the Mestiachala river in the Mestia Municipality, Georgia. At Mestia 1, two Pelton turbines with 6 m3/s turbine flow each will be installed. The net head is 207 m, the installed power will be 20 MW. The length of the penstock between the water intakes and the… Read more »

HEPP ZOTI

A diversion hydroelectric powerplant will be built around the village of Zoti, in the Guria Municipality, Western Georgia. The powerplant will have a total installed capacity of approx. 45 MW. It consists of two single powerplants with 2 intakes, two tunnels, penstock routes and two power houses. On behalf of the Georgian and Austrian investors, convex ZT GmbH… Read more »

HEPP LENGARICA

enso Hydro GmbH is building the hydro powerplant Lengarica in the Gjirokaster province in the Southeast of Albania. The Project is scheduled to generate an annual production of 32.2 GWh with an installed capacity of 9 MW. The river diversion type hydro powerplant can draw on a relatively large catchment area of 270 km2, the… Read more »

HEPP KUYUMA

An Austrian investor is building a hydropowerplant near Samsun, on the Black Sea coast in Turkey. On behalf of the investor, convex ZT GmbH carried out the basic design. The diversion hydropowerplant has a design flow of 5,9 m3/s and a net head of 399 m. It will equipped with two Pelton turbines with an… Read more »

HEPP GÖSSENDORF & KALSDORF

Energie Steiermark AG is building two run-off-river power stations on the river Mur, in the south of the city Graz. The powerplant Gössendorf with a three-field weir and a design flow of 200 m³ has a capacity of 18,75 MW; the powerplant Kalsdorf with a two-field weir and a design flow of 200 m³ has… Read more »

HEPP ASHTA

The project company Energji Ashta Shpk, a joint venture of Verbund and EVN, built the hydroelectrical power plant Ashta on the Drin River in the District of Shkodër in northwestern of Albania. With a maximum design discharge of 560 m3/s resp. 530 m3/s in the two power stations Ashta I and and Ashta II, the… Read more »

HEPP RAUDASCHL & KOCH

With the renovation of the existing power plant at the river Ager between Lake Attersee and Pichlwang also important ecological improvements in the affected river section were achieved. The new hydro power plants Raudaschl and Koch at the river Ager generate 300 resp. 320 KW of electrical energy. The Kaplan turbines of Gugler Hydro Energy… Read more »

HEPP ALLERSDORF

The municipal hydro power plant of Amstetten in Allersdorf is a hydro-power plant at the river Ybbs. The plant was erected in 1900 and has a rated output of 2.94 MW, which covers one-fifth of the electricity requirements of the town of Amstetten. convex carried out the structural engineering for CCi GmbH for the renovation… Read more »