ccpp_erbil_08_2014
kwerbil_image002
kwerbil_image004
kwerbil_image006
kwerbil_image008
kwerbil_image011
kwerbil_image015

CCPP, ERBIL
Iraq

 

In July 2012, Mass Group Holding has started converting its 1.000 MW Erbil Independent Power Project (IPP) from simple-cycle to combined-cycle technology. The present power plant is equipped with eigth 9E GE-gas turbines with a capacity of 1.000 MW and is Iraqi Kurdistan’s largest power plant. It will be converted to combined-cycle by additional eight HRSG’s and two GE-steam turbines, and generate 470 MW more electricity with the same fuel consumption.

On behalf of Mass Group Holding, APPA Consult GmbH is rensponsible for Owner`s Engineering works. Within the team of APPA, convex ZT GmbH is responsible for the design review of civil works design..

Owner:
Mass Group Holding Ltd, Jordan
General contractor:
ENKA, Turkey
Capacity (electrical):
470 MW additional
Start of construction:
2013
Start of commercial operation:
2015

-
Photos:
Mass Group Holding Ltd.