Figure 1 The conveyor bridge with new, additional columns

CONVEYOR BRIDGE PAPER MILL FRANTSCHACH

11. September 2015

The paper mill at mondi Frantschach in Frantschach, Austria is undergoing extension works. Amongst others, the 280 m long existing conveyor bridge had to be strengthened due to higher loads of the new and faster conveyor. 

On behalf of mondi Frantschach GmbH, convex ZT GmbH has been responsible for the tender- and structural design of the steelwork strengthening works.